<%@ Page %> The Welding Place - Sneak Peak


Sneak Peak

Here is a behind-the-scenes look at some chair dollies we built for a customer.  The first couple pictures didn't turn out so well, so we left them out.  As always, click the thumbnails for bigger pictures.

Take note of the two vertical frames on each side.  Those were individually built first.  In this picture, the two vertical frames are being joined together by the axle and two horizontal support tubes.

jigged.jpg (80044 bytes)

Now look at some of the completed frames.  Note the handles in the background waiting to be attached.

chairlift.jpg (77801 bytes)

Here is a handle clamped and ready to be welded.

handle.jpg (74795 bytes)

Ready for the paint booth, standing in a single-file line.

waiting.jpg (72343 bytes)

Painted, final assembly complete, and ready for the customer.  Now for the next batch...

forcust.jpg (73633 bytes)


The Welding Place
Local number: (253) 548-7176
sales@theweldingplace.com

Registered contractor #WELDIWP917M9

Copyright © 2001-2007 The Welding Place. All rights reserved.